Lean, sustainable biotech manufacturing

Sanofi Genzyme

Designed as an integral part of ARC’s Corporate Campus Master Plan for the Sanofi Genzyme Framingham campus, the LEED Gold Biologics Support Center provides research, education, and support space for the adjacent Framingham Cell Culture facility and other manufacturing facilities. The seven-story building brings together the metrology and validation departments and provides flexible space for Genzyme’s microbiology, chemistry, quality control laboratories, offices, and a data center.
Presentation Mode

To achieve Genzyme’s global goals for sustainability, the team achieved a 27 percent energy cost savings through improved thermal envelope design, high efficiency glazing, and reduced lighting density.

Katie Archard, AIA, LEED AP, ARC

Image
4_HORNER_ARC_11069_191_811.jpg

A central lecture hall, breakout spaces in the glass entrance tower, a café with roof terraces, and open offices and labs are designed to foster interaction among the Center’s 500 employees.

Image
7_HORNER_ARC_11069_200_A_WP.jpg
Image
3_HORNER_ARC_11069_117_811_Retouched.jpg
Image
6_HORNER_ARC_11069_132_811.jpg
Image
HORNER_ARC_11069_101.jpg

100%

Biologics building's electricity provided by renewable sources

Photography: John Horner Photography

Project
Biologics Support Center at Sanofi Genzyme
Location
Framingham, MA
Size
186,000 SF
Awards
2012 Project Achievement Award, Construction Management Association of America, New England Chapter

Lean, sustainable biotech manufacturing

Sanofi Genzyme

Project
Biologics Support Center at Sanofi Genzyme
Location
Framingham, MA
Size
186,000 SF
Awards
2012 Project Achievement Award, Construction Management Association of America, New England Chapter
Designed as an integral part of ARC’s Corporate Campus Master Plan for the Sanofi Genzyme Framingham campus, the LEED Gold Biologics Support Center provides research, education, and support space for the adjacent Framingham Cell Culture facility and other manufacturing facilities. The seven-story building brings together the metrology and validation departments and provides flexible space for Genzyme’s microbiology, chemistry, quality control laboratories, offices, and a data center.
Presentation Mode

To achieve Genzyme’s global goals for sustainability, the team achieved a 27 percent energy cost savings through improved thermal envelope design, high efficiency glazing, and reduced lighting density.

Katie Archard, AIA, LEED AP, ARC

Image
4_HORNER_ARC_11069_191_811.jpg

A central lecture hall, breakout spaces in the glass entrance tower, a café with roof terraces, and open offices and labs are designed to foster interaction among the Center’s 500 employees.

Image
7_HORNER_ARC_11069_200_A_WP.jpg
Image
3_HORNER_ARC_11069_117_811_Retouched.jpg
Image
6_HORNER_ARC_11069_132_811.jpg
Image
HORNER_ARC_11069_101.jpg

100%

Biologics building's electricity provided by renewable sources

Photography: John Horner Photography

Lean, sustainable biotech manufacturing / Sanofi Genzyme
7_HORNER_ARC_11069_200_A_WP.jpg
3_HORNER_ARC_11069_117_811_Retouched.jpg
6_HORNER_ARC_11069_132_811.jpg
HORNER_ARC_11069_101.jpg
4_HORNER_ARC_11069_191_811.jpg